2012
THE BIG LIFT
THE BIG LIFT. A 500-ton crane lifts onto a barge at Deep Cove in Eastport the 96-000-pound base support frame for Ocean Renewable Power Company's first grid-connected, commercial TidGen Power System. The frame was moved onto the barge by Perry Marine & Construction workers